DOCK LEVELER PIT CONSTRUCTION MISSISSAUGA | CASE STUDY

Accommodating your building to suit a growing business
What do you do when you only have one shipping door? Cut another hole in the wall of course! That's exactly what we had to do for our client to increase their productivity, efficiency and overall functionality.

Below, you can see an open space for an additional loading dock door on the left (we handle these tasks more often than you'd think). On the right, you see a typical drive-up ramp to a 12' x 16' loading dock door. Although in good condition, this isn't the ideal situation for mid-sized to large transport trucks loading/unloading shipments. 

 

Aside from adding in another door, our next solution was to install Cantilever Dock Levelers that extend outside the building wall, helping to prevent structure damage (especially until dock seals go in around the doors). As you can see below, after a pit was dug, the leveler was placed in position, ready for concrete to be poured to secure the unit.

   

The ramp also had to be removed to accommodate the new levelers, creating ease of access to the receiving area. It sure came along nicely with the second space for the new sectional door made below!


The existing door our customer had was also re-framed to match the new door we would be installing to avoid replacing it as it was in good working condition. On the left below, you see the new door, while on the right, re-framing begins!

 

Voila! Our client now has two easily accessible loading dock doors with dock levelers.


Is your business expanding? Before moving to a new building, know your options and make the most of what you currently have by increasing the value and overall functionality to meet your growing needs. From ensuring your leveler has the correct weight capacity, to properly-fitted dock bumpers to protect the building itself. Contact Wilcox at 1-800-528-4131 with any questions or concerns. We'll find the perfect solution for your unique business! 


Tuesday, 25 October 2016

EDGE OF DOCK REPLACEMENT | CASE STUDY

Cantilever-Dock-Leveler-Installation | Dock Leveler Building Construction Mississauga | Wilcox Door


Conventional Dock Levelers are installed inside the building into a pit like the picture of the blue leveler to the left. An opening is cut and once the leveler is placed inside, concrete is poured around the unit to secure it.




Below, we have an example of an Edge of Dock Replacement in Toronto. These are typically installed on the exterior of a building for loading dock areas with limited space.

Weathered-Edge-of-Dock | Edge of Dock Leveler Toronto | Wilcox Door
Before Replacement
Edge of Dock Levelers are quick and easy to operate. After loading/unloading is complete and the truck has backed away, the leveler actually returns back to it's stored position. Important elements of any dock leveler include dock bumpers and in this case, block risers to align the bumpers with the leveler. These are the black rectangles with 2 holes on either side of the leveler, used to protect the building structure from truck impacts.

Edge-of-Dock-Replacement | Edge of Dock Leveler with Bumpers | Wilcox Door
After Replacement
Interested in a product like this for your facility? Be sure to let a representative know what load capacities you typically receive too as this is crucial to choosing the right dock leveler. Whether your loading dock area lacks space or can fit a full dock leveler, there's a solution to suit any space!